Code summary
Often confused with
- 25120 - Industri Tangki, Tandon Air, Dan Wadah Sejenisnya Dari Logam: Compare this code when the main activity is better described as industri Tangki, Tandon Air, Dan Wadah Sejenisnya Dari Logam rather than industri Generator Uap Bukan Ketel Pemanas.
- 25119 - Industri Produk Logam Struktural Lainnya: Compare this code when the main activity is better described as industri Produk Logam Struktural Lainnya rather than industri Generator Uap Bukan Ketel Pemanas.
- 25113 - Industri Produk Logam Struktural Baja Untuk Konstruksi Berat: Compare this code when the main activity is better described as industri Produk Logam Struktural Baja Untuk Konstruksi Berat rather than industri Generator Uap Bukan Ketel Pemanas.
OSS filing review
The OSS review for KBLI 25130 should start from the NIB path, standard certificates, sector licences, and business-model consistency. For factories, production workshops, and processing companies, the most common failure point is not the OSS interface itself, but the mismatch between the real activity, the location, and the code being filed.
- Official OSS portal: Validate the NIB path, risk-based flow, and downstream licences for industri Generator Uap Bukan Ketel Pemanas.
- Guide to NIB registration in OSS: Use this checklist to test KBLI consistency, entity data, and whether the team is ready to check the linked KLU before filing as well.
- OSS Risk & licences hub: Open this hub to review the low, medium-low, medium-high, and high-risk flows at system level.
Note: the final per-code risk tier still has to be confirmed directly in OSS.
HS / BTKI review
Cross-border trade review for industri Generator Uap Bukan Ketel Pemanas usually starts from the BTKI chapter or section closest to the goods output. This block is meant as a customs-screening starting point, not as a claim that one KBLI code automatically equals one HS code.
- BTKI Section XV - Base metals and articles thereof: Use this section as the first screening layer before moving down to narrower BTKI chapters.
- BTKI Section XVI - Machinery, boilers, and electrical equipment: Use this section as the first screening layer before moving down to narrower BTKI chapters.
Source: the DJBC BTKI chapter directory and the official tariff page.
Core KBJI occupations for KBLI 25130
These occupation groups are linked through a semantic matrix based on the KBLI section and KBJI major groups. The tier is shown so users can distinguish official data from derived links.
- 7 - Craft and related trades workers
- 8 - Plant and machine operators and assemblers
- 3 - Technicians and associate professionals
Occupation source: BPS KBJI 2014. The current KBLI relation is derived, not an official 1:1 correspondence table.
Region and payroll review
The operating location for KBLI 25130 cannot be separated from region codes, provincial wage floors, and when relevant zone incentives. For industri Generator Uap Bukan Ketel Pemanas, the region review usually starts from the business domicile, the real operating site, and the provincial payroll footprint used by factories, production workshops, and processing companies.
- Indonesia region codes: 38 provinces are already loaded with administrative profiles and region codes.
- Minimum wages by province: 38 provincial minimum-wage profiles are available for first-pass payroll screening.
- KEK and FTZ: Check this layer if the business model is sensitive to location incentives or customs facilities.
Source: the Satu Data Indonesia region-code dataset, national wage references, and the official KEK list.
| Level | Code | Description |
|---|---|---|
| Section | C | Industry |
| Division | 25 | Industri Produk Logam Pabrikasi Bukan Mesin Dan Peralatannya |
| Group | 251 | Industri Produk Logam Struktural, Tangki, Tandon Air, Dan Generator Uap |
| Class | 2513 | Industri Generator Uap Bukan Ketel Pemanas |
| Activity | 25130 | Industri Generator Uap Bukan Ketel Pemanas |
Related tools and layers
- KLU 25130
- OSS risk for this code
- Foreign ownership hub
- BPJS calculator
- PPh 21 TER calculator
- Minimum wages by province
Tax norm summary
- 10 provincial capitals norm: 29.0%
- Other provincial capitals norm: 27.0%
- Other areas norm: 26.0%
- Cross-check with DJP before filing tax returns.
Sources
| Source | URL | Regulation | Tier |
|---|---|---|---|
| BPS KBLI 2025 | https://bps.go.id | BPS Regulation No. 7 of 2025 | official |
| Putranto Alliance KLU table | https://putranto-alliance.com/indonesian-business-field-classification-klu/ | Derived from DJP references | fallback |
Compliance risk score
4 of 4 factors passing
- pass Verified in official source - KBLI 2025 code 25130 is present in the official BPS classification release.
- pass Hierarchy chain is complete - Section C, Division 25, Group 251, and Class 2513 are all present in the loaded hierarchy.
- pass Official thresholds documented - A linked KLU/NPPN layer is loaded for KBLI 25130, including published norm values.
- pass Trade or export match available - 2 BTKI review starting point(s) are currently mapped for KBLI 25130.
Who is this code for
This code typically applies to the following activity types, operating roles, or business models:
Source: MANUAL, 2026-05-04
FAQ
What is the main operating test for keeping KBLI 25130 under Industri Generator Uap Bukan Ketel Pemanas?
Keep KBLI 25130 when the day-to-day operating core genuinely sits in industri Generator Uap Bukan Ketel Pemanas inside the wider production processes, assembly, finishing, and processed-goods output layer. The code is weak if the business only touches that field indirectly while its dominant activity belongs somewhere else.
How should KBLI 25130 be separated from Industri Tangki, Tandon Air, Dan Wadah Sejenisnya Dari Logam?
The line is drawn by the actual primary activity carried out at class 2513 and group 251 level. If the operational centre is better described as industri Tangki, Tandon Air, Dan Wadah Sejenisnya Dari Logam, the user should compare again instead of keeping KBLI 25130 only because it still sits in the same wider production processes, assembly, finishing, and processed-goods output branch.
If the business also performs pure trading, repair work, or raw-material extraction, can KBLI 25130 still remain the lead code?
KBLI 25130 can remain the lead code only when industri Generator Uap Bukan Ketel Pemanas is still the operational and revenue centre. If the dominant line is actually pure trading, repair work, or raw-material extraction, the safer path is to compare neighbouring branches before filing.
Why should factories, production workshops, and processing companies still read Group 251 and Class 2513 before selecting KBLI 25130?
Because group and class level show the nearest branch boundary before the endpoint is fixed. Reading those layers first helps the user decide whether industri Generator Uap Bukan Ketel Pemanas is truly the right endpoint or just one of several nearby codes in the same branch.
Which checkpoints still need review after KBLI 25130 is selected?
Choosing KBLI 25130 does not finish the compliance review. After the code is selected, the user still needs to review the OSS risk path, the linked KLU mapping, and the downstream operational checkpoints triggered by filing and implementation.
Changelog
- 2026-03-19 - The code page was published with the official KBLI hierarchy and an activity summary.
- 2026-03-19 - Linked KLU, related tools, and compliance blocks were updated.
This portal is informational. Confirm the final obligation and competent authority before filing, licensing, payroll, tax, or investment decisions. Read methodology.